Telephone
13969090828
Product classification
/ Products Classification Click to expand+Shandong Jingmei installation workshop isolation network steps.
The workshop isolation net installation procedure is relatively simple, similar to the road isolation belt, but its main function is still different. Quarantine requirements are also different. The specific steps are as follows:
1. Determine the installation location: In this step, you need to determine the installation location. During installation, attention should be paid to the extent of the isolation area and the degree of risk associated with the area. After confirmation, make relevant design drawings and detailed installation list, and prepare materials according to the list.
2, is to lay the foundation: according to the area involved in the drawings, establish the foundation of the workshop isolation net column, layout and bury the relevant parts.
3, is the installation: in this step, we need to install the workshop isolation net. First use fixed screws to connect the embedded parts with the column. After all equipment is installed, it must be checked for safety and stability.
4, is to check and accept the installation of the installed workshop isolation network. Here, check the stability and safety according to the design requirements of the drawings to ensure normal, relevant facilities have been installed.
More information about Shandong Jingmei Security Equipment Co., LTD. Please check:
1, [Shandong Jingmei] aluminum fence assembly method
2, [Shandong Jingmei] how to ensure the assembly accuracy of aluminum frame
3, [Shandong Jingmei] aluminum frame how to do sealing plate